Page 8 of 21 FirstFirst ... 67891018 ... LastLast
Results 106 to 120 of 308

Thread: New Basketball/Volleyball Facility

  1. #106
    Quote Originally Posted by DBT View Post
    I wonder what it would look like if they retro fitted it with sandstone?
    i was wondering that the other day, a hell of a letter better i would imagine.

  2. #107
    Club Member BuffAlum2007's Avatar
    Join Date
    Sep 2008
    Location
    Ontario, Canada (eh)
    Posts
    897
    Quote Originally Posted by tante View Post
    wow the CEC looks even WORSE from that angle.
    I always liked the view of that side of the CEC...that vertical side is the only side that gives the CEC some scale and makes it look like an actual arena - from the other sides it looks like a convention or expo center...shame that the new facility is going to kill that view...

  3. #108
    Moderator Buffnik's Avatar
    Join Date
    Mar 2009
    Location
    Boulder
    Posts
    29,819
    Blog Entries
    24


    Foundation is in and things are going up.


  4. #109

  5. #110
    I drove by the other day and saw a steel worker sitting on top of a beam spanning between two columns. Hopefully, it'll start to take shape pretty quickly now.

  6. #111
    Moderator Buffnik's Avatar
    Join Date
    Mar 2009
    Location
    Boulder
    Posts
    29,819
    Blog Entries
    24
    I didn't realize the photo I posted was auto-updating.

    Cool.

    You can also see the progress on the new building on the East Campus from that shot.

  7. #112
    Quote Originally Posted by Buffnik View Post
    I didn't realize the photo I posted was auto-updating.

    Cool.

    You can also see the progress on the new building on the East Campus from that shot.
    That is actually a new dorm at WillVill. The new biotech building on east campus is a different thing.


  8. #113
    I drove by to see it in person and it make a huge difference than what you see in the webcam shot that buffnik posted. They are getting close to putting the roof on that thing. Hopefully we have a month or so of nice weather so they can get the outside totally finished.

  9. #114
    Moderator Buffnik's Avatar
    Join Date
    Mar 2009
    Location
    Boulder
    Posts
    29,819
    Blog Entries
    24
    Quote Originally Posted by tante View Post
    I drove by to see it in person and it make a huge difference than what you see in the webcam shot that buffnik posted. They are getting close to putting the roof on that thing. Hopefully we have a month or so of nice weather so they can get the outside totally finished.
    Roof is now on. They'll be able to make great progress this winter. The weather has really cooperated this fall.

  10. #115
    Quote Originally Posted by Buffnik View Post
    Roof is now on. They'll be able to make great progress this winter. The weather has really cooperated this fall.
    I think they have the ceiling of the gym up and still need to finish the 2nd story with office etc before the room goes on.

  11. #116
    I was just looking at google maps, and they have a pretty new aerial image of the campus (within the past 6 months or so...). When did they build all of those outdoor basketball courts behind the Coors events center?
    2012 Goals:

    1. Move to Colorado
    2. ???
    3. Profit

  12. #117
    Its the wonder of nature! buff4bcs1985's Avatar
    Join Date
    Feb 2008
    Location
    Highlands Ranch
    Posts
    18,365
    Blog Entries
    5
    They've been there a while they just. Redid them fairly recently




    Quote Originally Posted by absinthe View Post
    BCS is the voice of reason.

  13. #118
    Quote Originally Posted by buff4bcs1985 View Post
    They've been there a while they just. Redid them fairly recently
    yeah I think they have been there for at least 5 years.

  14. #119
    Club Member NashBuff's Avatar
    Join Date
    Jun 2009
    Location
    Westminster, CO
    Posts
    2,489
    They just put up the last steel beam and now they can work on roofing and the outer walls and then the construction guys will have all winter and spring to finish the interior. The weather has cooperated and perhaps God wants to see some great times at CU again.

    GO BUFFS!

  15. #120
    Quote Originally Posted by NashBuff View Post
    They just put up the last steel beam and now they can work on roofing and the outer walls and then the construction guys will have all winter and spring to finish the interior. The weather has cooperated and perhaps God wants to see some great times at CU again.

    GO BUFFS!
    are they going to be able to put the flagstone up on the outside during the winter? I hope they get the steps to the CEC done soon because it is awful to walk around and go up the ramp if you park in the garage.

Visitors found this page by searching for:

new volleyball facility

new colorado basketball facility

basketball volleyball facility

COLORADO BASKETBALL PRACTICE FACILITy PHOTOGRAPHS

view of colorado basketball facility

univ of colo basketball practice

colordo unversity new basketball practice

colorado practice facility cam

basketball practice facility colorado buffaloes

colorado sherpa volleyball

colorado basketball facility

cu basketball volleyball practice facility

colorado basketball practice facility

renderings of university of colorados new basketballvolleyball facilities

powered by vBulletin san francisco planetarium

cu new basketball facility tour

farrand field webcams

Baylor Aerial

university of colorado basketball facility

new basketball facility

volleyball facility construction

volleyball facility

cu basketball practice facility construction cam

cu new basketball facility

cu indoor valleyballbasketball

SEO Blog

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •