    in the benson article in the dc they talked about adding club seating to the foam dome. does anyone out there know anything about this? how they would do it, where it would go, ect.?
     
  2. Bass

    Bass Club Member Club Member

    Joined:
    May 5, 2011
    Messages:
    422
    Likes Received:
    84
    i assume they would make it look like the Pit in 'querque. that place was awesome not only with the atmosphere but the building itself was great. It has the original same setup as Coors of a sunken court and they did a great job of remodeling it.
     
  3. Shldr2Shldr

    Shldr2Shldr Club Member Club Member

    Joined:
    Jan 21, 2011
    Messages:
    16,831
    Likes Received:
    4,996
    I still do not understand how they would be able to remodel the keg. It would be extremely costly and also an engineering nightmare to deal with that dome. Not saying it can't be done, but its going to be difficult.
     
  4. Bass

    Bass Club Member Club Member

    Joined:
    May 5, 2011
    Messages:
    422
    Likes Received:
    84
    this is me just spitballing here and i very well might be wrong but they would add a second level that would house club seating. UNM basically did this for $60M which is costly but i dont think its an engineering nightmare. I believe that the Keg needs an update as much if not worse than Folsom.
     
  5. RumblinBuff

    RumblinBuff That one blogging guy Club Member

    Joined:
    Oct 18, 2007
    Messages:
    1,327
    Likes Received:
    241
    $60 million for UNM hoops, no problem; that's all they have. $60 million for CU hoops, even in the state it's in, would be a stretch. Especially considering the $200+ million the football team is about to/maybe/possibly eat up.
     
  6. tante

    tante Club Member Club Member

    Joined:
    Jul 21, 2009
    Messages:
    25,787
    Likes Received:
    1,359
    Washington reinforced their roof with the huge steel beams. I think we could do something similar.
     
  7. absinthe

    absinthe Ambitious but rubbish. Club Member Junta Member

    Joined:
    Dec 1, 2006
    Messages:
    25,890
    Likes Received:
    1,504
    the good news for us is coors is a fairly common design and we've got previous work-product to build on, that saves a lot of time and money.
     
  8. sackman

    sackman Club Member Club Member

    Joined:
    Jul 8, 2005
    Messages:
    48,499
    Likes Received:
    4,500
    While there's a part of me that would love to see the CEC hold 15K+, I still think we're a year or two away from needing that kind of capacity. Would be very cool, though. The Pit is a very impressive facility.
     
  9. RK

    RK UBL Club Member

    Joined:
    Oct 5, 2010
    Messages:
    4,920
    Likes Received:
    474
    I want us to make our stadium a carbon copy of the Pit, that place is so amazing.
     
  10. Shldr2Shldr

    Shldr2Shldr Club Member Club Member

    Joined:
    Jan 21, 2011
    Messages:
    16,831
    Likes Received:
    4,996
    The type of reno needed to make the keg a similar arena to The Pit would be hugely expensive. Probably somewhere near $80million. (The pit had two renovations). The issue is the roof and the CU architectural guidelines. The Pit developed a cantilevered roof system that allowed them to span the arena with no supports. This kind of system could be deployed here. Basically pop the roof off, add a ring of club seats, and place the new roof back on top.(Likely would not be able to include the center TV's like some have mentioned in the past)Would not greatly increase the seating capacity Probably by a thousand depending on how big the suites were. One thing that could be done in this situation is instead of boxes behind the hoops extend the bleachers behind the hoops all the way to the roof on each end. These upgrades would probably increase capacity to the 14k ball park. maybe 15. The concourses could be pushed out between the main entrances to make room for a team store/concessions/new bathrooms.

    Those saying the demand is not there right now for this kind of expansion are right, however they get back to the big dance again and watch out. CU basketball is exploding right now and we are all here to watch it.
     
  11. sackman

    sackman Club Member Club Member

    Joined:
    Jul 8, 2005
    Messages:
    48,499
    Likes Received:
    4,500
    We need Folsom upgrades and the ipf first. Renovations to the CEC are another 5-10 years off, IMO.
     
  12. tante

    tante Club Member Club Member

    Joined:
    Jul 21, 2009
    Messages:
    25,787
    Likes Received:
    1,359
    Agreed but we all know how slow the administration moves. So we start talking about it now. They announce there will be an announcement in five years. They delay the announcement for another year. Replace the video boards and then finally break ground. Maybe.
     
  13. CUFan

    CUFan Welcome back Club Member

    Joined:
    Jun 22, 2010
    Messages:
    6,961
    Likes Received:
    469
    By the time the admin is done, our new facilities will be sub par.
     