Raising the bar. CU needs to do something. And I think CU can do something a hell of a lot better than this.
$2.3 million facility. http://www.sltrib.com/sports/4037823-155/utah-skiing-utes-break-ground-on
The 5,800-square-foot multi-level structure will serve the men’s and women’s alpine and Nordic teams, housing locker rooms, ski tuning rooms, a video and film room and a large conference room. There will also be space for equipment storage and covered parking for the team vehicles. http://www.utahutes.com/sports/c-ski/spec-rel/062216aaa.html
$2.3 million facility. http://www.sltrib.com/sports/4037823-155/utah-skiing-utes-break-ground-on
The 5,800-square-foot multi-level structure will serve the men’s and women’s alpine and Nordic teams, housing locker rooms, ski tuning rooms, a video and film room and a large conference room. There will also be space for equipment storage and covered parking for the team vehicles. http://www.utahutes.com/sports/c-ski/spec-rel/062216aaa.html